Connect with us

Economy

DANGOTE REFINERY Commissioning: Plan Your Movement Around Lekki-Epe Corridor, LASG Tells Residents

Published

on

Dangote Group pays N500,000 to each family of students killed in crash

…Charges LASTMA, others on effective traffic management of the event

Ahead of the proposed commissioning of the Dangote Refinery by President Muhammadu Buhari on Monday, the 22nd of May, 2023, the Lagos State Government has urged residents to plan their movement in and out of the Lekki-Epe corridor between 8.00 am and 2.00 pm.

A statement released by the Lagos State Ministry of Transportation, duly signed by the Commissioner, Dr. Frederic Oladeinde stated that it becomes imperative for the State Government to alert the public, particularly regular road users in the Lekki-Epe zone, due to high vehicular movement that will be witnessed in the axis as a result of the commissioning.

The Statement further urged residents to plan their journeys around the axis, in order to forestall avoidable delays in travel time.

It added that Lagos State Traffic Management Authority (LASTMA) and other traffic enforcement Personnel have been charged to ensure effective management and control of traffic, urging Motorists to cooperate with them for a seamless flow of traffic.

Economy

Selloffs In MTN, Others Drag Market N25bn Down

Published

on

Selloffs In MTN, Others Drag Market N25bn Down

…RT.BRISCOE, Tantalizer lead the losers’ table 

 The equity market on Wednesday lost N25 billion due to selloffs in MTN Nigeria, Dangote Sugar and Guaranty Trust Holding Company (GTCO), among other stocks.

Specifically, the market capitalisation, which opened at N56.670 trillion, shed N25 billion or 0.04 per cent to close at N56.645 trillion.

The All-Share Index also dropped 0.04 per cent, or 43.3 points, to close at 100,032.32, as against 100,075.59 recorded on Tuesday.

As a result, the Year-To-Date (YTD) return slipped to 33.78 per cent.

United Capital led 10 per cent to close at N36.30, Africa Prudential followed by 9.88 per cent to close at N8.90, and Cutix gained 9.86 per cent to close at N6.13 per share.

Oando rose by 5.63 per cent to close at N16.90, and Julius Berger advanced by 4.79 per cent to close at N87.50 per share.

Conversely, RTBRISCOE led the losers’ log with 5.71 per cent to close at 66k, and FTN Cocoa Processors trailed by 4.44 per cent to close at N1.72 per share.

Tantalizer declined by 4.26 per cent to close at 45K, Neimeth International Pharmaceuticals shed 3.53 per cent to close at N1.64 and Consolidated Hallmark Plc lost N3.45 to close at N1.40 per share.

Analysis of the market activities showed trade turnover settled higher relative to the previous session, with the value of transactions up 35.71 per cent.

A total of 1.10 million shares valued at N10.08 billion were exchanged in 8,720 deals, compared to 368.39 million shares valued at N7.42 billion exchanged in 8,151 deals posted previously.

Jaiz Bank led the activity log-in volume with 528.49 million shares worth N1.15 billion, Cutix followed by 194.64 million shares worth N1.19 billion.

Zenith traded 77.75 million shares valued at N3.11 billion to lead the log-in value, Universal Insurance transacted 36.26 million shares worth N12.35 million and FCMB sold 33.88 million shares worth N257.09 million. 

Continue Reading

Economy

Stock Market Maintains Positive Trends, Up 0.11%

Published

on

Stock market maintains positive trends, up 0.11%

…Redstarex, Deap Capital lead the losers’ table 

 The Nigerian stock market maintained its positive trends on Tuesday, increasing the overall market index by 0.11 per cent.

Investors gained N62 billion or 0.11 per cent as the market capitalisation, which opened at N56.608 trillion closed at N56.670 trillion.

The All-Share Index also advanced by 0.11 per cent or 109.3 points to close at 100,075.59, compared to 99,966.28 recorded on Monday.

As a result, the Year-To-Date (YTD) return rose to 33.84 per cent.

Sustained by interest in Tier-one banking tickers such as Zenith Bank, FBN Holdings, United Bank For Africa (UBA), and Access Corporation, alongside United Capital, UACN and other advanced equities drove the market’s positive performance.

Meanwhile, market breadth closed positive with 19 gainers and 15 losers on the floor of the Exchange.

On the gainers’ table, United Capital led by 10 per cent to close at N33, Cutix Plc followed by 9.84 per cent to close at N5.58 and Sunu Assurances gained 7.75 per cent to close at N1.39 per share.

Cornerstone Insurance rose by 7.69 per cent to close at N2.10 and UACN went up by 7.42 per cent to close at N15.20 per share.

On the other hand,  Redstarex led the losers’ table by 9.82 per cent to close at N3, and McNichols Plc trailed by 9.01 per cent to close at N1.01 per cent.

Deap Capital Management and Trust Plc lost 5.77 per cent to close at 49k, Eterna Plc declined by 4.44 per cent to close at N17.20 and Universal Insurance shed 2.78 per cent to close at 35k per share.

Analysis of the market activities showed trade turnover settled higher relative to the previous session, with the value of transactions up 0.78 per cent.

A total of 368.39 million shares valued at N7.42 billion were exchanged in 8,151 deals, compared with 362.43 million shares valued at N7.37 billion exchanged in 8,405 deals posted previously.

Zenith Bank led the activity table in volume and value with 57.42 million shares worth N2.25 billion, and Access Corporation followed with 36.75 million shares valued at N707.17 million.

Guaranty Trust Holding Company(GTCO) also sold 29.16 million shares valued at N1.33 billion, Jaiz Bank traded 28.34 million shares worth N60.94 million and UBA transacted 20.31 million shares valued at N466.16 million.

Continue Reading

Economy

Sanitary Pads: Reps Query Minister Over N65m Spent On New Year Party, Others

Published

on

 The Minister of Women Affairs, Mrs Uju Kennedy-Ohaneye has drawn the ire of the House of Representatives following the unguarded manner she allegedly spent monies which included expenditures of N45 million for a New Year party and, N20 million for sanitary pads.

The House of Representatives which has now queried the minister, also frowned on her other unrelated expenditure which includes N1.5 million for vehicle fuel.

Rep. Kafilat Ogbara, Chairman, House Committee on Women Affairs, led the interrogation of the Minister, over the non-payment of N1.5 billion to contractors despite the fund release in Abuja.

She said that the investigative hearing was aimed at uncovering the truth and not witch-hunting the Minister and the officials of the ministry.

The committee also investigated the alleged diversion of funds meant for contractor payments, following a petition from contractors.

The committee also sought clarification on funds appropriated for the African First Lady’s mission and the whereabouts of the N1.5 billion meant for contractor payments.

The minister however denied the allegations of misappropriation, overspending, and non-payment to contractors.

The procurement officer confirmed contractors’ claims, and the Director of Finance and Administration acknowledged only paying approved contracts.

It would be recalled that the committee had at its last sitting summoned the minister to appear before it to explain the rationale behind the non-payment.

The committee also ordered the stoppage of all 2024 contract processes by the Ministry of Women’s Affairs until the whereabouts of the money for the said contracts are determined

Continue Reading
ADEBAYO SARUMI: Doyen of Maritime Industry Marks 80th Anniversary, Saturday 

Editor’s Pick

Politics